A new production unit in Sétif
Delivered in eleven months, the new line doubles our client’s food-processing capacity.

After eleven months of work, our client’s new production unit in Sétif is running. Our teams handled the engineering, manufacturing and assembly of the line, then trained 35 operators.
A site without accidents
More than 120,000 hours worked without a single lost-time accident: a result we owe to preparing every task.
